First, a camera is inserted into the pipeline to inspect the current condition. The pipes are then cleaned mechanically and rinsed with water to flush out all dirt and impurities.
After cleansing, the pipeline is dried with an air blower and then inspected again to ensure it’s thoroughly dry and there are no tears or punctures. Any punctures are patched and repaired before continuing.
After the pipeline has passed the inspection, it is coated with enough ElastoFlake to achieve a minimum coating of 3 mm. This normally requires several layers of ElastoFlake, sprayed and brushed with the ElastoTec system. When the coating is finished, the pipeline is inspected again by camera and the results are documented to ensure that the outcome is seamless, consistent, and free from irregularities. The pipeline is ready for use after 20 min to 1 hour of drying.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |